Key Project | Flawless Delivery: Beijing New Airport Construction Headquarters

北京新机场建设指挥部

The Beijing New Airport Construction Headquarters was the organization tasked with the construction of the Beijing Daxing International Airport. This headquarters was primarily responsible for project planning, environmental management, construction coordination, and the development of supporting facilities. This included terminal design, runway planning, and the integration of the comprehensive transportation network for the Beijing-Tianjin-Hebei region.

In November 2017, the headquarters was honored with the title of “National-Level Civilized Unit for the Fifth Session” by the Central Guidance Commission on Building Spiritual Civilization. The terminal, spearheaded by the headquarters, features a innovative five-pier corridor layout and a “three north-south & one east-west” runway configuration. Supporting infrastructure includes a 700,000-square-meter terminal building and a comprehensive transportation hub, with a planned annual passenger capacity of 72 million.

The project implemented digital construction management, the sponge airport concept, and a dedicated de-icing fluid recovery and treatment system, achieving goals for environmental management and green building. Construction was fully launched across all 23 contract sections of the airfield area, with the new airport rail line also commencing simultaneously.

This highly complex project featured specialized seismic isolation designs and a tight schedule. Upon winning the bid, Hebei Guchen Engineering Rubber Co., Ltd. responded immediately, initiating tasks such as shop drawing development, material procurement, production scheduling, and product testing concurrently. During the delivery phase, Guchen closely coordinated with inspection agencies, conducting streamlined inspections and synchronizing shipments, which ensured the on-site schedule was met and culminated in a perfect delivery.

发表评论

您的邮箱地址不会被公开。 必填项已用 * 标注

购物车